Eilbeck Cranes is delivering an integrated package of specialised bridge cranes to support tunnelling construction activities across multiple Suburban Rail Loop worksites.

SRL East requires lifting systems for TBM assembly and disassembly, shaft excavation, structural works, tunnel segment supply and general construction lifts. The package therefore needed more than one standard crane: it required purpose-built systems matched to different loads, spans and work fronts.
|
|
|
|

Reliable, precise lifting infrastructure enables critical tunnelling and construction activities to proceed safely and productively.
|
|
|
|
|
|
|
HEAVY-LIFT PURPOSE Configured for TBM assembly and disassembly, with segment supply and general-lift support. |
PRECISION CONTROL Variable-speed drives on hoist, cross travel and long travel support controlled movement. |
|
|
OPERATIONAL VISIBILITY Load display, cameras, telemetry, travel limits, lighting and warning systems support operators. |
AUSTRALIAN DELIVERY Designed and manufactured in Australia for intensive project-specific lifting operations. |
|
|
ALEX FRASER EAST |
50 t bridge crane |
SSY WEST |
50t bridge crane |
|
ALEX FRASER EAST |
280 t TBM assembly crane |
SSY WEST |
120t bridge crane |
|
ALEX FRASER WEST |
50 t bridge crane |
MONASH NORTH |
120t bridge crane |
|
ALEX FRASER WEST |
320 t TBM assembly crane |
SUPPORT AREA |
30t bridge crane |
Together, the package supports shaft excavation, structural works, TBM assembly and disassembly, tunnel segment supply and general lifting activities across the project.
The SRL package demonstrates the importance of Australian engineering and manufacturing capability in delivering nationally significant infrastructure. Eilbeck’s scope brings together project-specific design, structural manufacture, electrical systems, transport planning, installation and commissioning.
The Port Kembla slab yard is a critical link in the integrated steelmaking process. The replacement cranes needed precise handling, high availability and dependable performance in a demanding industrial environment. A8/M8 classification supports intensive process-crane service and repeated slab movements.
As tunnelling progresses beneath Melbourne, Eilbeck cranes will support critical lifts above ground. Big infrastructure demands big lifting solutions, and Eilbeck delivers.