The Metro Tunnel (Tunnels and Stations PPP Project) is one of the largest transport infrastructure projects undertaken in Australia and consists of the design and construction of twin nine-kilometre rail tunnels from Kensington to South Yarra, five new underground stations and a range of systems required to support the effective operation of the new tunnel and stations.
After successfully delivering and commissioning 2 x 50 and 1 x 100t cranes to the Early Works of Melbourne Metro (MMT), Eilbeck Cranes has been award the supply through to commissioning of 6 cranes of similar nature for the MMT Segment Yard to be delivered in 2018 for the Cross Yarra Partnership. Eilbeck has been engaged in pre tender of the design of segment handling cranes for the precast facility at Melbourne’s Deer Park for 8-12 months. These cranes will be manufactured in June/July and ready for commissioning in September 2018. Eilbeck will build 2 off 10(5+5)t x 22m span overhead cranes, 2 off 10(5+5)t x 7.6m semi portal and 1 off 20t(10+10)t x 40t (7.5/7.5 m + 1 off 20(10+10)t x 35t (7.5/7.5)m full portal cranes. The bulk of work will take place at Eilbeck Cranes’ Sydney and the brand new Melbourne facilities, currently under construction.
Eilbeck has a long history with tunnel boring projects across Australia and a track record of successful partnership with the main contractors as John Holland, Lendlease, and Bouygues. After having delivered cranes for precast facilities and shaft kibble operation cranes for WestConnex, NorthConnex and Bella Vista projects in Sydney for the Sydney Metro 2 Project (SM2). At present time Eilbeck is well on the way to deliver another set of 10 cranes for the Marrickville Segment facility for the SM2 Project.
FMG Iron Bridge Contract for 20 conveyor winches
The latest ES80 50 t Mucking Crane packed with heaps of safety features
New addition to the Eilbeck ES Hoist range 10 t x 70 m HOL with man riding features with dual…
Designed in Sydney by Eilbeck's Engineering Team, the 500t full portal crane, and the additional…
Eilbeck has been engaged in pre tender of the design of segment handling cranes for the precast…
100t and 2 off 50t Tunnelling Site Overhead Cranes for John Holland & KBR JV
The 100t full portal crane commissioned at the East Site primary crusher facility has passed the…
The new 25t x 17m span double girder overhead crane, manufactured in Eilbeck’s state of the art…
Eilbeck worked closely with BHP to develop the best crane solution for shell demolition, shell…
The higher class was a requirement due to the intended heavy use of these cranes, as Steel Force are…
We see the requirement of Eilbeck to manufacture in Australia to keep quality guaranteed high, and…
The crane capacities are huge, the main winch lifting 100t for heavy machinery retrieval from a 100m…
Eilbeck supplies 5t x 52.5m span EDL crane to Sikorsky Airport Base at Yerriyong
When global oilfield provider of engineered services and products to the offshore oil and gas…
As part of Rio Tinto Iron Ore’s Rail Capacity Enhancement project, Eilbeck Cranes has supplied three…
120t x 10m FPZLK
Eilbeck Cranes has successfully completed Factory Acceptance Testing and delivered 5 cranes capacity…
260t x 23.39m ZLK Crane, Airport Link Project - Brisbane
Australian Overhead Crane Engineering at the Height of its Game
10t Circular Crane
Veolia MBT Crane
Eilbeck cranes for NorthConnex
7 Mile Upgrade RSM
Overhead Cranes for Jandakot Project
InfoSitemapDisclaimer |
NewsCareersNewsletters |
MediaProjectsBrochures |
ContactContact UsOnline Quotes |