500t & 250t TBM Full Portal Cranes for Melbourne Metro West Gate

100% designed & fabricated by Eilbeck Cranes Sydney, Mackay, Melbourne and Perth. Completely Machined in Eilbeck's Sydney Machine shop.

Designed, built and delivered both cranes in 10 months.

Commissioning 500t & 250t Full Portal Gantry Cranes
Tunnel Boring Machine assembly
500t crane handling TBM segments
500t Girders Fabrication, Sydney
125t ES Hoists for 500t Crane - FAT at Eilbeck's Sydney Works

Eilbeck Newsletters

WA Premier Visit

Posted on: May 13, 2020

WA Premier Mark McGowan and Transport Minister Rita Saffioti visited Eilbeck Crane Bassendean

FK Gardner - IMS Mackay Building

Posted on: Aug 5, 2019

Through building head contractor F K Garner and Sons, a builder which Eilbeck Cranes has worked extensively before with on many successful projects…

Melbourne Metro Tunnel Segment Yard Cranes

Posted on: May 13, 2019

Eilbeck Cranes has delivered cranes for the Precast yard in Deer Park – Segment Factory Ravenhall, Victoria. This segment yard factory will support the…

Loco Crane Replacements

Posted on: Mar 13, 2019

Eilbeck has been commissioned to manufacture and deliver 2 double girder cranes 75/20 tonnes each, to replace the old, used ones in the Heavy Rail Loco…

Sydney Metro 2 – All Cranes Delivered

Posted on: Oct 11, 2018

A total of 18 cranes has been manufactured to cater the needs of the project’s tunneling and segment yard sites.

Sydney Metro 2 – Load testing and Complete Assembly

Posted on: Aug 13, 2018

On Tuesday 7th of August Eilbeck Cranes achieved another milestone in the delivery and commissioning of the Sydney Metro 2 project

Sydney Metro 2 – Ahead of schedule

Posted on: Jul 16, 2018

Last Wednesday Eilbeck Cranes delivered and installed another crane for the biggest public transport project in Australia, the Sydney Metro 2.

Sydney Metro 2 Barangaroo - Crane Load Testing

Posted on: Jun 18, 2018

Eilbeck Cranes completed the successful commissioning of the first overhead gantry crane for the Sydney Metro Stage 2 project, specifically dedicated to…

TBM Handling Cranes for Melbourne West Gate

Posted on: May 14, 2018

250t full portal crane will bring segments from the yard and 500t FPZLK will lower them down the shaft.

Melbourne Metro Tunnels Segment Yard Cranes

Posted on: Apr 9, 2018

The Metro Tunnel (Tunnels and Stations PPP Project) is one of the largest transport infrastructure projects undertaken in Australia and consists of the…

New Eilbeck Cranes Melbourne Factory

Posted on: Dec 4, 2017

Eilbeck Cranes new Victoria manufacturing facility is located at 2/321 Doherty's Road, Truganina, Melbourne Victoria 3029. This is strategically located…

Accreditation Achievement

Posted on: Oct 10, 2017

We are proud to announce that Eilbeck Cranes has achieved ISO 9001:2015, ISO 14001:2015 & AS/NZS 4801 Certifications through BUREAU VERITAS

Eilbeck Cranes Sydney Metro Contract

Posted on: Oct 6, 2017

Eilbeck Cranes was able to offer a fully customised solution for a complex heavy duty machinery from concept to delivery to site in less than 20 weeks. A…

Eilbeck Cranes in Townsville

Posted on: Oct 5, 2017

The new crane was custom built in Eilbeck Cranes Mackay manufacturing facility and engineered to ensure years of trouble-free operation in the unprotected…

Australian Overhead Crane Engineering at the Height of its Game

Posted on: May 3, 2017

The hoist sports 2 x 250kW drive motors, heavy duty gearboxes, 4 disc brakes 2 of which enable the crane being rated for man riding along with nearly a…

BHP Olympic Dam Circular Crane

Posted on: Feb 15, 2017

YouTube   Facebook   Linkedin   View profile on ICN Gateway

Sydney
6 Moorlands Road
Ingleburn NSW 2565


Newcastle
1/50 Sandringham Avenue
Thornton NSW 2322


Brisbane
3/12 Sudbury Street
Darra QLD 4076


Mackay
32 Diesel Drive
Paget QLD 4740


Perth
28 Jackson Street
Bassendean WA 6054


Adelaide
2/23 Clovelly Avenue
Royal Park SA 5014


Melbourne
321 Doherty’s Road
Truganina VIC 3029