Temporary Construction Cranes for the Electric Slag Furnace Rebuild at Olympic Dam (SA)


When client BHP Billiton wanted to utilise temporary special construction cranes for their Electric Slag Furnace Rebuild (ESFR) at Olympic Dam Mine Site (SA), they turned to Eilbeck Cranes and both worked closely together to bring to light a bespoke engineered solution for this special application.

Lifting hoists travel synchronously while maintaining 5 + 5T (2 off 5T) MRC and independently maintaining 5t MRC each.

The temporary construction cranes were planned to be used for the ESFR Major Shutdown (MSD) at the Olympic Dam facility.

The requirement was for the temporary construction cranes to be specifically designed ‘fit-for-purpose’, fabricated, tested and commissioned to meet the construction requirements of the ESFR strict standards whilst complying with Australian and key BHP Billiton Standards.

The Scope comprised the supply of several crane, of which two were specifically designed and built for the ESFR:

  • ESFR-01: Transfer Crane – 10t
  • ESFR-02: Circular Crane – 10(5+5)t


The hoists travel together circumferentially (long travel of the crane) and travel both independently and synchronised in the radial direction in full 360° (cross travel). The hoists are able to lift independently and synchronised.

The centre line diameter of circular monorail is 11.08m, and it had to be divided into sections for ease of handling and installation on site. The assembly and erection plan of the circular monorail had to be engineered in a very specific way in order to be executed safely and efficiently on site.

read the full article



Eilbeck Newsletters

Sydney Metro 2 Barangaroo - Crane Load Testing

Posted on: Jun 18, 2018

Eilbeck Cranes completed the successful commissioning of the first overhead gantry crane for the Sydney Metro Stage 2…

TBM Handling Cranes for Melbourne West Gate

Posted on: May 14, 2018

250t full portal crane will bring segments from the yard and 500t FPZLK will lower them down the shaft.

Melbourne Metro Tunnels Segment Yard Cranes

Posted on: Apr 9, 2018

The Metro Tunnel (Tunnels and Stations PPP Project) is one of the largest transport infrastructure projects undertaken…

New Eilbeck Cranes Melbourne Factory

Posted on: Dec 4, 2017

Eilbeck Cranes new Victoria manufacturing facility is located at 2/321 Doherty's Road, Truganina, Melbourne Victoria…

Accreditation Achievement

Posted on: Oct 10, 2017

We are proud to announce that Eilbeck Cranes has achieved ISO 9001:2015, ISO 14001:2015 & AS/NZS 4801 Certifications…

Eilbeck Cranes Sydney Metro Contract

Posted on: Oct 6, 2017

Eilbeck Cranes was able to offer a fully customised solution for a complex heavy duty machinery from concept to delivery…

Eilbeck Cranes in Townsville

Posted on: Oct 5, 2017

The new crane was custom built in Eilbeck Cranes Mackay manufacturing facility and engineered to ensure years of…

YouTube   Facebook   Linkedin   View profile on ICN Gateway

Sydney
6 Moorlands Road
Ingleburn NSW 2565


Newcastle
1/50 Sandringham Avenue
Thornton NSW 2322


Brisbane
3/12 Sudbury Street
Darra QLD 4076


Mackay
32 Diesel Drive
Paget QLD 4740


Perth
28 Jackson Street
Bassendean WA 6054


Adelaide
2/23 Clovelly Avenue
Royal Park SA 5014


Melbourne
321 Doherty’s Road
Truganina VIC 3029