Eilbeck Cranes' New Factory in Melbourne


Eilbeck Cranes’ new Victoria manufacturing facility is located at 2/321 Doherty's Road, Truganina, Melbourne Victoria 3029. Strategically located less than 20 minutes from Melbourne CBD & Ports Precinct, 15 minutes to Melbourne International Airport and within 5 minutes to all major freeways access. Eilbeck Cranes (Victoria) will have approximately 20 to 30 staff operating from this facility in both crane manufacture and service.

2/321 Doherty's Road, Truganina (Facility under construction)

The following is a snapshot of our manufacturing plant:

  • A State of the art, purpose built modern workshop layout suited for efficient crane manufacturing.
  • The factory will be a 2786 m2 industry best practice manufacturing plant complete with a dedicated crane service & storage area of 190 m2 and with an additional 248 m2 of office & amenities.
  • Two 20 tonne Double Girder EOTCs, one 10 tonne (5+5) EOTC with plate magnet and four 2 tonne EKL wall travelling cranes, all manufactured and installed to move both parts and fabrications around the facility safely and efficiently.
  • Hard stand area covering 3,665 m2 allowing for storage and future expansion as required with total land size 6,605 m2.
  • We are investing heavily in automation of the crane manufacturing process with the installation of blast cleaning facilities, plate transfer sorting conveyors, a sub arc welding splice table, pneumatic beam press along with a 4 head automated girder welding all assembly all configured into a 100-metre-long beam line for girder manufacture. Generally, up to 3 girders can be manufactured at one time on the beam line.
  • The Steel Shot Blasting Machine with a fully automated Transfer Conveyor System which clamps the steel plates in position prior to welding allowing for cleaner welds and consistent quality with a surface finish best suited for the application and adhesion of the paint applied immediately after fabrication.
  • Modern automatic and semi-automatic welding machines which ensure the clean accurate welding of all cranes are carried out in a timely, efficient manner.
  • Paint booth with a 6m x 36m long capacity, with a state of the art fume and dust extraction system, giving our cranes a superior finish.
  • 75 tonne Metal Working Machine.

Eilbeck Newsletters

Sydney Metro 2 – Load testing and Complete Assembly

Posted on: Aug 13, 2018

On Tuesday 7th of August Eilbeck Cranes achieved another milestone in the delivery and commissioning of the Sydney Metro 2 project

Sydney Metro 2 – Ahead of schedule

Posted on: Jul 16, 2018

Last Wednesday Eilbeck Cranes delivered and installed another crane for the biggest public transport project in Australia, the Sydney Metro 2.

Sydney Metro 2 Barangaroo - Crane Load Testing

Posted on: Jun 18, 2018

Eilbeck Cranes completed the successful commissioning of the first overhead gantry crane for the Sydney Metro Stage 2 project, specifically dedicated…

TBM Handling Cranes for Melbourne West Gate

Posted on: May 14, 2018

250t full portal crane will bring segments from the yard and 500t FPZLK will lower them down the shaft.

Melbourne Metro Tunnels Segment Yard Cranes

Posted on: Apr 9, 2018

The Metro Tunnel (Tunnels and Stations PPP Project) is one of the largest transport infrastructure projects undertaken in Australia and consists of…

YouTube   Facebook   Linkedin   View profile on ICN Gateway

Sydney
6 Moorlands Road
Ingleburn NSW 2565


Newcastle
1/50 Sandringham Avenue
Thornton NSW 2322


Brisbane
3/12 Sudbury Street
Darra QLD 4076


Mackay
32 Diesel Drive
Paget QLD 4740


Perth
28 Jackson Street
Bassendean WA 6054


Adelaide
2/23 Clovelly Avenue
Royal Park SA 5014


Melbourne
321 Doherty’s Road
Truganina VIC 3029