Lihir Gold Project, PNG

11/7/2011

Project Ref:
 
42382
Client:
 
PNG NEWCREST MINING
 
Project:
 
Lihir Gold Project
 
Scope:
 
Supply 1off ‐ 15t x 26.5M FPELK portal crane with 6m cantilever on one side

Challenge:
Newcrest Mining purchased a special outdoors Eilbeck Crane to upgrade the gold mining operations at LIHIR Island to 1 million ounce gold per week! The crane has got 6m cantilever on one side that provides capability of lifting from outside of the mega structure. The crane operates with a motorised cable reeler that provides 80 meters of travel. The other interesting capability of the Eilbeck Crane is to detect any foreign object that is interrupting the crane long travel along the runways. This function slows down and stops the crane at any time from any distance to ensure the operational safety!

Outcome:
 
 
FPELK portal crane

FPELK portal crane

FPELK portal crane

FPELK portal crane

FPELK portal crane

FPELK portal crane

Info

Sitemap
Disclaimer
 

Location

Addresses
Contact Us
 

About

Eilbeck
Company

© Copyright 2012 Eilbeck Cranes

YouTube Twitter
Citrix_Logon